Installation
|
Residential | KEC | Installation | Savings | Testing | Mortgage |
|
|
 |
How KEC is installed?
Installation must be done by a license electrician. To do
otherwise voids the warranty. The KEC is attached to the top 220/240 volt breaker/200amp service.
By
installing the KEC in this location, you are hitting both sides of
the bus bar in your panel insuring amperage surge protection.
|
|
| |
Residential KEC
PF-1000 Installation
Photo essay of simple installation process -- a 15-minute job when
routine. |
|
| |
 Opening panel |

Setting up
|
|
1. Hang KEC unit on wall
|
 Opening service disconnect cover
|
 Service disconnect panel removed
|
|
| 2. Take panel cover off and drill a 7/8 inch hole in corner. |
 Meter "before" reading
|
 Insert wire protector in bottom of panel |
|
| |
 Thread wires from unit through hole |
 Threading wires
|
|
| |
 Threading wires
|
 Start nut on cable protector
|
|
| |
 Situate knar unit
|
 Fastening cable protector
|
|
| |
 Screw knar unit to wall
|
 Strip wire ends
|
|
3. Turn off top 220/240 breaker
|
 Fasten ground lead
|
 Fasten two hot leads to 40-amp breaker
|
|
4. Connect the green wire to grounding bar.
|
 Hot leads installed
|
 Disconnect cover back on |
|
5. Loosen two screws under breaker.
|
|
|
|
6. Slip the two red wires under the two screws and tighten.
|
 Turn breaker to the knar unit on |
 It's on |
|
| 7. Turn breaker back on and replace cover. |
|
|
|
| 8. Light should be lit. |
|
|
|
| |
|
|